Housing complex in Antiparos
A small housing project - three two-storey residences in a single land plot - and its surrounding landscape is designed and scheduled for delivery in December 2023.
A small housing project - three two-storey residences in a single land plot - and its surrounding landscape is designed and scheduled for delivery in December 2023.
The ground floor of an old apartment building was redesigned anew so to host 4 super-small multifunctional apartments. The project is scheduled for September 2023.
A 37-room 4* hotel in Skiathos is redesigned. The renovated hotel is scheduled for opening in April 2024.
A 66-room 3* hotel facing the natural laggon close to CouCounaries beach in Skiathos is redesigned so to upgrade to a 4* hotel. At the point, preliminary study is complete and the building permit is on the way. The new 4* hotel is scheduled for opening in April 2024. [...]
Having already constructed the Waterfront area in 2021-2022 season, the resort has planned to implement our study for the VIP restaurant reconstruction. The whole project was conducted in just 10 days, just before New Year's Day, 2020.
In view of the upcoming 2022-2023 renovation project, all 22 suites are subject to be completely renovated. Each and every one is developed in 2 levels (living room - bedrooms). The first step (survey measurements) is already complete, the preliminary study is on the way (scheduled to be complete by the end of October [...]